Title 2 
ORGANIZATION AND ADMINISTRATION 
Chapters: 
2.04 Finance Director 
2.08 Deputy City Attorney 
2.11 Department of Public Safety (Ord. 4769 §1, 1993) 
2.16 Municipal Court 
2.20 Public Bidding Rules (Ord. 4585 §2, 1987) 
2.21 Public Improvement Contracts (Ord. 4585 §2, 1987) 
2.22 Contracts Under Certain Dollar Amounts (Ord. 4856 §1, 1996) 
2.32 Personnel 
Chapter 2.04 
FINANCE DIRECTOR 
Sections: 
2.04.010 Functions and Duties. 
2.04.020 Acting Finance Director--Office Created. 
2.04.030 Acting Finance Director--Appointment. 
2.04.010 Functions and Duties. 
From and after January 1, 1977 the effective date of the City Charter of 1976, the 
Finance Director shall perform, and is hereby authorized and directed to perform, 
all functions and duties and take all actions heretofore required to be performed 
by the City Officer known prior to January 1, 1977 as City Auditor, Auditor and 
Police Judge, City Treasurer, City Recorder, and the like pursuant to any 
ordinance, resolution, regulation, or policy of the City enacted or adopted prior to 
or after January 1, 1977 or pursuant to the Charter of the City in effect 
immediately prior to the City Charter of 1976, or pursuant to any Oregon or 
Federal Statute, Law, Rule or Regulation, or pursuant to the Constitution of the 
United States or the State Constitution. (Ord. 4136 (part), 1977) 
2.04.020 Acting Finance Director--Office Created. 
The office of Acting Finance Director is authorized and established for the 
performance of those functions required of the Finance Director pursuant to the 
City Charter, for the execution of certifications pertaining to minutes, ordinances, 
resolutions, and other official records of the City, and for the execution of 
municipal general obligation, revenue, and other bonds, and to enable 
performance of those functions required by Oregon Revised Statutes of the 
Finance Director, who is known in such statutes as "City Clerk," "City Recorder," 
"City Auditor," and by other like designations. The Acting Finance Director shall 
serve in the place and stead of the Finance Director at those times when the 
Finance Director is absent from the City, or if the Finance Director is for any other 
reason unable to act as Finance Director and to discharge any or all of the duties 
or functions of the office of Finance Director as described in this chapter. (Ord. 
4250 §1, 1978) 
2.04.030 Acting Finance Director--Appointment. 
The Acting Finance Director shall be named and appointed by the City Manager, 
except that if pursuant to Chapter V, Section 2(5), of the City Charter in the case 
of the absence of the Manager from the City for more than 7 days, or of 
temporary disability to act as Manager, or resignation as Manager, or of 
discharge of the Manager by the Council, then the duly appointed Manager Pro 
Tem shall appoint the Acting Finance Director upon approval of the majority of 
the Council. (Ord. 4250 §2, 1978) 

Chapter 2.08 
DEPUTY CITY ATTORNEY 
Sections: 
2.08.010 Office Created. 
2.08.020 Number of Positions. 
2.08.030 Powers and Duties. 
2.08.010 Office Created. 
There is created the office of Deputy City Attorney. Each person named as a 
Deputy City Attorney shall be and remain a member in good standing of the 
Oregon State Bar. (Ord. 3701 §1, 1969) 
2.08.020 Number of Positions. 
The number of Deputy City Attorneys required shall be determined by the City 
Attorney and each Deputy City Attorney shall be appointed by the City Attorney 
for an indefinite term. Each Deputy City Attorney shall be subject to removal by 
the City Attorney at any time. (Ord. 3701 §2, 1969) 
2.08.030 Powers and Duties. 
Each Deputy City Attorney named shall have authority to perform all the 
functions and duties of the City Attorney, subject to the direction of the City 
Attorney. (Ord. 3701 §3, 1969) 
Chapter 2.11 has been added by (Ord. 4769 §1, 1993) 
Chapter 2.11 
DEPARTMENT OF PUBLIC SAFETY 
Sections: 
2.11.010 Authority. 
2.11.020 Appointments. 
2.11.010 Authority. 
There is hereby established a Department of Public Safety for the City of Grants 
Pass to perform the below listed functions. 
1. To enforce the laws of the State of Oregon and the City of Grants Pass; 
and 
2. To assist the City Manager in protecting the health, safety, and welfare of 
the citizens and visitors of Grants Pass; and 
3. To implement the goals and directives of the City Council as directed by 
the City Manager. 
2.11.020 Appointments. 
The City Manager is authorized to appoint persons to the Department of Public 
Safety that are necessary to fulfill the Manager's responsibilities as set forth in 
the Municipal Charter, the Municipal Code, and the goals and directives of the 
City Council. 
This Chapter has been amended by Ord. 5267, 2005 
Chapter 2.16 
MUNICIPAL COURT 
Sections: 
2.16.000 Municipal Court 
2.16.010 Right to Jury Trial. 
2.16.020 Number of Jurors. 
2.16.030 Terms of Court. 
2.16.040 Jury Panel Selection. 
2.16.050 Jury Selection. 
2.16.060 Challenge of Jurors. 
2.16.070 Selection of Alternate Jurors. 
2.16.080 Number of Concurring Votes Needed to Render Verdict. 
2.16.090 Juror Compensation. 
2.16.100 Serving of Subpoena or Jury Duty Notice--Penalty for Violation. 
2.16.110 Assessment of Court Costs. 
2.16.000 Municipal Court. 
Violations of the Municipal Code (including the Development Code as a portion thereof) 
shall be prosecuted in the Circuit Court of the State of Oregon for the County of 
Josephine unless the specific language of the applicable ordinance provides for 
alternate review. 
Chapter 2.20 through 2.22 is hereby replaced by Ord. 5176 §1, 2003 
Chapter 2.20 
PUBLIC BIDDING RULES 
Sections: 
2.20.001 Designated. 
2.20.002 Rules. 
2.20.003 Filing. 
2.20.004 Rule Adoption. 
2.20.005 Definitions. 
2.20.006 Competitive Bidding. 
2.20.010 Bid Documents. 
2.20.015 Public Notice. 
2.20.020 Bid Preparation. 
2.20.025 Bidder Prequalification. 
2.20.030 Bidder Submissions. 
2.20.035 Bid Security. 
2.20.040 Pre-Bid Conferences. 
2.20.045 Brand Name Products. 
2.20.050 Protest of Bid Specifications. 
2.20.055 Addenda to Bid Documents. 
2.20.060 Pre-Opening Modification or Withdrawal of Bids. 
2.20.065 Receipt, Opening and Recording of Bids. 
2.20.070 Late Bids, Late Withdrawals and Late Modifications. 
2.20.075 Mistakes in Bids. 
2.20.080 Time For Acceptance. 
2.20.085 Extension of Time For Acceptance For Bid. 
2.20.090 Bid Evaluation and Award. 
2.20.095 Low Tie Bids. 
2.20.100 Rejection of Individual Bids or Proposals. 
2.20.105 Negotiation With Bidders Prohibited. 
2.20.110 Bidder Disqualification. 
2.20.115 Cancellation of Invitations to Bid. 
2.20.120 Disposition of Bids or Proposals of Bid Canceled. 
2.20.125 Documentation of Award. 
2.20.130 Foreign Contractor. (ORS 279.021) 
2.20.135 Availability of Award Decisions. 
2.20.140 Performance Security. 
2.20.145 Right to Audit Records. 
2.20.150 Right to Inspect Plant. 
2.20.155 Contract Cancellation Procedures. 
2.20.001 Designated. 
The Council is designated as the Local Contract Review Board of all contract 
concerns of the City. 
2.20.002 Rules. 
The City Manager is authorized to recommend rules for the administration of 
public contracts for the Council's adoption for the City of Grants Pass consistent 
with the purchasing laws of the State of Oregon. 
2.20.003 Filing. 
The City Manager shall file a copy of this ordinance with the governing body of 
Josephine County. 
2.20.004 Rules Adoption. 
The City of Grants Pass does hereby adopt the Model Rules of the Attorney 
General, 2002 update, for the purpose of establishing rules governing public 
contracts in the City of Grants Pass. These rules shall remain in effect until such 
time as they may be amended by the Council of the City of Grants Pass. The 
provisions of the Grants Pass Municipal Code, including but not limited to 
chapters 2.20, 2.21, and 2.22 shall constitute procedures for public contracts and 
shall supercede the Attorney General Model Public Contract Rules to the extent 
such rules conflict with the provision of this code. 
2.20.005 Definitions. 
For purposes of these rules the following definitions apply: 
A. Bid. A competitive offer in which price, delivery (or project completion) 
and conformance to specification will be the predominant award criteria. 
Bid also includes a proposal when authorized by the Board where a 
solicitation of competitive proposals or offers is utilized for procurement 
when specification and price will not necessarily be the predominant 
award criteria. 
B. Bidding Period. The span of time between the date of the invitation to bid 
and the time and date set for receipt of bids. A minimum of 14 calendar 
days shall be provided, unless a shorter time is deemed necessary in the 
public interest for a particular procurement. 
C. Bid Opening. The date, time and place set for opening of competitive 
bids. 
D. Bid Closing. The date and time announced as the deadline for the receipt 
of bids. 
E. Lowest Responsible Bidder. The lowest bidder who has substantially 
complied with all prescribed public bidding procedures and requirements 
and who has not been disqualified by the City under ORS 279.037. 
F. Addenda to the Bid Documents. Additions or changes to the bid 
documents defined as addenda shall be labeled as such and distributed in 
accordance with these rules. 
G. Descriptive Literature. Materials submitted by prospective vendors to 
provide information concerning the products available in response to the 
bid. 
H. Bid Sample. A representative specimen of the item that will be available 
in response to the bid. 
I. Contract Release Order. The document authorizing an additional 
purchase on an existing requirements contract. 
J. Manager. The City Manager of the City of Grants Pass or any City 
employee appointed in writing by the Manager to act for him in the 
exercise of the authority granted by the Charter and under the provisions 
of these rules. 
2.20.006 Competitive Bidding. 
Contracts issued by the City will be awarded in accord with the provisions of 
Chapters 2.20, 2.21, and 2.22 of this code and the applicable State Law. 
2.20.010 Bid Documents. 
A. The Bid Documents Shall Include the Following: 
1. Instructions and information to bidders concerning the bid 
submission requirements, including the time and date set for 
opening of bids, the address of the office to which bids are to be 
delivered, and any other special information. 
2. Where applicable, the purchase description, specifications, delivery 
or performance schedule, inspection and acceptance requirements, 
and special evaluation factors. 
3. The contract terms and conditions, including warranty and bonding 
or other bid security requirements, as applicable. 
4. All addenda issued by the City. 
B. Determination of Contractual Terms and Conditions: 
1. The City Manager is authorized to determine the contractual 
provisions, and terms and conditions of solicitations and contracts, 
provided such provisions, terms and conditions are not contrary to 
statutory or regulatory requirements. 
C. Terms and Conditions Applicable to Public Contracts: 
1. Except as specifically exempted for projects and contracts below the 
bid limits established in this code, and along with the Oregon 
preference requirement in ORS 279.021(1), the City shall establish 
standard terms and conditions including those applicable as prescribed 
by ORS 279.310 to ORS 279.575. 
a. Payment of laborers and material men; contributions to 
Industrial Accident Fund; liens and withholding taxes 
(ORS 279.312). 
b. Payment of claims by public officers (ORS 279.314). 
c. Hours of labor (ORS 279.316 and 279.338). 
d. Environmental and natural resources regulations 
(ORS 279.318). 
e. Payment for medical care and attention to employees 
(ORS 279.320). 
f. Voluntary termination of the contract (ORS 279.326). 
g. Suspension of the work (ORS 279.328 - 279.333). 
h. Maximum hours and overtime (ORS 279.334). 
i. Claims for overtime (ORS 279.336). 
j. Overtime requirement for local governments 
(ORS 279.340 and 279.342). 
k. Prevailing wage rates (ORS 279.348 - 279.365). 
l. Retainage (ORS 279.400 - 279.430 and ORS 279.575). 
m. Contractor's bond (ORS 279.526 and 279.536). 
n. Notice of claim (ORS 279.528). 
o. Labor and material liens (ORS 279.538 and 279.540). 
p. Liability in absence of bond (ORS 279.542). 
q. Progress payments (ORS 279.575). 
2. Such terms and conditions shall become an integral part of each 
contract except as provided herein. 
D. Special Terms and Conditions. The City may also establish special terms 
and conditions applicable to specified categories of contracts. Any special 
terms and conditions shall be included in the bid documents and become 
an integral part of those contracts. 
E. Compliance and Exceptions to Terms and Conditions: 
1. Bidders are responsible for noting the terms and conditions 
included as applicable to each set of bid documents. 
2. By signing and returning the bid proposal form, the bidder is 
acknowledging acceptance of and the intent to abide by the terms 
and conditions. 
3. Any exceptions to the terms and conditions must be clearly stated 
in writing by the bidder in the signed returned proposal. The City 
reserves the right to reject any bid which takes exception to the 
terms and conditions. Exceptions to the terms and conditions 
become contractual obligations only upon written acceptance by 
the City. 
2.20.015 Public Notice. 
A. Distribution. Bid documents and notices when required for public bid as 
provided in this code shall be mailed or otherwise furnished to a sufficient 
number of bidders for the purpose of securing competition. Notices of 
availability shall indicate where, when, and for how long the bid 
documents may be obtained; generally describe the supply, service or 
construction desired; and may contain other appropriate information. The 
City may charge a fee or require a deposit for the bid documents. 
B. Advertising: 
1. Unless exempted, every formal solicitation of bids shall be 
advertised. An advertisement for bids shall be published at least 
once in at least one local newspaper of general circulation and in as 
many additional issues and publications as the City may determine 
to be necessary or desirable to ensure competition. 
2. All advertisements for bids shall state: 
a. If the contract is for a public work, that no bid will be received 
or considered unless the bid contains a statement by the 
bidder that the provisions of ORS 279.350 are complied with. 
b. The date and time after which bids will not be received which 
date shall not be less than 5 days after the date of the last 
publication of the advertisement. 
c. The date that prequalification applications must be filed if 
prequalification is a requirement. 
d. The character of the work to be done or the items to be 
purchased. 
e. The office where specifications may be seen. 
f. The name and title of the person designated to receive bids. 
g. The date, time, and place that bids will be publicly opened. 
h. The City may reject any bid not in compliance with all 
prescribed public bidding procedures and requirements, and 
may reject for good cause any or all bids upon a finding of 
the City it is in the public interest to do so. 
C. Posting of Bid Advertisement. A copy of each bid advertisement shall be 
posted at the Finance Office of the City. Bidders may obtain a copy upon 
request. 
2.20.020 Bid Preparation. 
Bid preparation instructions: 
A. Bids shall be typed or prepared in ink and shall be signed in ink by the 
bidder or an authorized representative of the bidder. 
B. Bids shall be made on the bid form provided and submitted in a sealed 
envelope. 
C. Alterations or erasures, if any, shall be initialed in ink by the person 
signing for bid. 
D. Bids shall contain a fully executed bid package, including all required 
documents and descriptive literature. 
2.20.025 Bidder Prequalification. 
The City Manager may require mandatory prequalification of bidders on forms 
prescribed by the City Manager. When prequalification is required by the bid 
documents as a condition for bidding, the City shall not consider the bid(s) of any 
prospective bidder who is not prequalified in accordance with the City's adopted 
rules and regulations. 
If a bidder is currently prequalified by the State Department of Transportation or 
the State Department of General Services or by the City to perform contracts, the 
bidder shall be rebuttably presumed qualified to perform similar work for other 
public agencies if such bidder furnishes appropriate documentation. 
2.20.030 Bidder Submissions. 
A. Bid Samples and Descriptive Literature. Bid samples or descriptive 
literature may be required when it is necessary to evaluate required 
characteristics of the items bid. Bid samples will be returned in 
accordance with provisions contained in the bid documents. 
B. Identification of Bids. Bids shall be submitted in a sealed envelope 
appropriately marked or in the envelope provided by the agency, 
whichever is applicable, to ensure proper identification and special 
handling. The City shall not be responsible for the proper identification 
and handling of any bids not submitted in the designated envelope. 
C. Receipt of Bid. It is the bidder's responsibility to ensure that bids are 
received by the designated office of the City prior to the stated bid closing 
time. 
2.20.035 Bid Security. 
A. Public Improvement Contracts. Bid security not to exceed 10% of the bid 
shall be required for public improvement contracts where the amount of 
the contract exceeds $50,000. The bid security shall be forfeited if the 
bidder fails to execute the contract promptly and properly if awarded. 
B. Other Public Contracts. Bid security not to exceed 10% of the bid may be 
required by the City for other contracts in order to guarantee acceptance 
of the award. This requirement shall be stated in the bid documents. 
C. Contracts Under $50,000. Bid security for contracts of less than $50,000 
may be required by the City Manager or designee in accord with this code. 
D. Form of Bid Security. The following forms of bid security will be accepted 
by the City: 
1. Surety bond from a surety company authorized to do business in 
the State of Oregon; or 
2. Cashier's check, certified check, or savings and loan secured 
check. 
3. Cash 
4. Unrestricted Loan proceeds. 
5. Specific accounts where the City is the sole entity approved to 
withdraw funds. 
6. Unrestricted letters of credit. 
E. Return of Bid Security. The bid security of all unsuccessful bidders shall 
be returned after a contract has been executed, or all bids have been 
rejected. The City may return the bid security of unsuccessful bidders 
after bid opening but prior to award, if the return does not prejudice bid 
award and provided that the security of at least the three lowest bidders is 
retained pending the execution of a contract. 
2.20.040 Pre-Bid Conferences. 
Pre-bid conferences may be held by the City Manager to explain the 
procurement requirements or conduct site inspections. The City Manager may 
require attendance at the pre-bid conference as a condition for bidding. Such 
conferences shall be announced to all prospective bidders in the bid documents. 
The pre-bid conference shall be held within a reasonable time after the bid 
documents have been issued to allow bidders to become aware of it, but 
sufficiently before bid closing to allow consideration of the conference results in 
preparing bids. Statements at the pre-bid conference shall not change the bid 
documents unless confirmed to all prospective bidders by means of a written 
addendum to the bid documents. 
2.20.045 Brand Name Products. 
A. Product Requirement by Brand Name Prohibited. Specifications for public 
contracts shall not expressly or implicitly require any product by any brand 
name or mark, nor the product of any particular manufacturer or seller 
except pursuant to exemptions authorized by these rules, including but not 
limited to: 
1. Copyrighted materials. 
2. Single seller of product required and single manufacturer of 
compatible products. 
3. Specification of particular brand names or products. 
4. The City may identify products by brand names so long as 
"approved equal" or "or equal" is included in the bid documents. 
2.20.050 Protest of Bid Specifications. 
A. Time for Submission of Protest. Protests of bid specifications shall be 
presented to the City in writing at least four calendar days prior to the bid 
opening. 
Such protest shall include the reasons for protest and any proposed 
changes to specifications. No protest against award because of the 
content of bid specifications shall be considered after the deadline 
established for submitting such protest. 
B. Extension of Opening Date. If any bid specification protest is received in 
accordance with Section 1. above, the bid opening date may be extended 
if necessary to allow consideration of the protest and issuance of any 
addenda to the bid documents. 
C. Identification of Protest. Envelopes containing protests of bid 
specifications shall be marked as follows: 
Bid Specification Protest 
Bid Number or Other Identification 
--------------------------------------------- 
2.20.055 Addenda to Bid Documents. 
A. Form. Changes to bid documents for any project greater than $50,000 in 
estimated value, shall be accomplished by addenda. The bidder shall 
acknowledge receipt of all addenda issued, either with the bid or 
separately prior to bid opening. 
B. Distribution. Addenda shall be sent to all prospective bidders known to 
have obtained the bid documents or attending any mandatory pre-bid 
conferences. 
C. Timeliness. Addenda shall be issued within a reasonable time (5 days 
prior to bid closing) to allow prospective bidders to consider them in 
preparing their bids, but in no case less than 72 hours before the bid 
closing. If necessary, the City Manager may notify prospective bidders by 
telegram or telephone, followed by a confirming written addendum. 
2.20.060 Pre-Opening Modification or Withdrawal of Bids. 
A. Modifications. Bids once submitted may be modified in writing prior to the 
time and date set for bid closing. Any modifications shall be signed by an 
authorized officer, and state that the new document supersedes or 
modifies the prior bid. Telegraphic modification shall not be accepted 
unless authorized in the bid documents. To ensure the integrity of the 
bidding process, the envelope containing any modifications to a bid shall 
be marked as follows: 
Bid Modifications 
Bid Number or Other Identification 
--------------------------------------------- 
B. Withdrawals. 
1. Bids may be withdrawn by written notification signed by an 
authorized person and received prior to the time and date set for 
bid closing. Bids also may be withdrawn in person prior to the 
scheduled bid closing upon presentation of appropriate 
identification. 
2. Unopened bids withdrawn under subsection A. above, may be 
released to the bidder after voiding any date and time stamp used. 
3. Requests to withdraw mailed bids shall be marked as follows: 
Bid Withdrawal 
Bid Number or Other Identification 
--------------------------------------------- 
C. Documentation. All documents relating to the modification or withdrawal 
of bids shall be made a part of the appropriate bid file. 
2.20.065 Receipt, Opening and Recording of Bids. 
A. Receipt. Upon its receipt, each bid and modification shall be timestamped 
or marked by hand but not opened and shall be stored in a 
secure place until bid opening. If bids or modifications are opened 
inadvertently or are opened prior to the time and date set for bid opening 
because they were improperly identified by the bidder, the bids or 
authorized modification documents shall be resealed and stored for 
opening at the correct time. When this occurs, documentation of this 
procedure shall be placed in the bid file. 
B. Opening and Recording. Bids and modifications shall be opened publicly, 
at the time, date, and place designated in the bid documents. If witnesses 
are present at the bid opening, and to the extent practicable, the name of 
each bidder, the bid price(s), and such other information as considered 
appropriate, shall be read aloud. On voluminous bids, the City may advise 
bidders as part of the bid documents that the bid items and prices will not 
be read aloud. 
C. Availability. The opened bids shall be available for public inspection prior 
to award except to the extent the bidder designates trade secrets or other 
proprietary data to be confidential under ORS 192.500(1)(b). The City 
Manager shall verify and determine that the confidential information 
claimed to be exempt is, in fact, exempt from disclosure under the Oregon 
Public Records Law. Material so designated shall accompany the bid and 
shall be readily separable from the bid in order to facilitate public 
inspection of the non-confidential portion of the bid. Prices, makes, model 
or catalog numbers of items offered, scheduled delivery dates, and terms 
of payment shall be publicly available regardless of any designation to the 
contrary. 
2.20.070 Late Bids, Late Withdrawals, and Late Modifications. 
A. Definition. Any bid received after the time and date set in the bid 
documents for receipt of bids is late. Any request for bid withdrawal or 
modification received after the time and date set for bid closing is late. 
Timeliness shall be determined by the Manager, and such determination 
shall be final. 
B. Disposition. Late bids, late modifications, or late withdrawals shall not be 
considered. 
2.20.075 Mistakes in Bids. 
A. General. Clarification or withdrawal of a bid because of an inadvertent, 
nonjudgmental mistake in the bid requires careful consideration to protect 
the integrity of the competitive bidding system, and to assure fairness. 
Except as provided in this rule, if the mistake is attributable to an error in 
judgment, the bid may not be corrected. Bid correction or withdrawal by 
reason of a nonjudgmental mistake is permissible but only to the extent it 
is not contrary to the interest of the City or the fair treatment of other 
bidders. 
B. Mistakes Discovered After Bid Closing But Before Award. This subsection 
prescribes procedures to be applied in situations where mistakes in bids 
are discovered after the time and date set for bid closing but before award. 
1. Minor Informalities. Minor informalities are matters of form rather 
than substance that are evident from the bid documents, or 
insignificant mistakes that can be waived or corrected promptly 
without prejudice to other bidders or the City; that is, the informality 
does not affect price, quantity, quality, delivery, or contractual 
conditions except in the case of informalities involving unit price. 
Examples include, but are not limited to, the failure of a bidder to: 
a. Return the number of signed bids or the number of other 
documents required by the bid documents. 
b. Sign the bid form in the designated block so long as a 
signature appears in the bid documents evidencing an intent 
to be bound. 
c. Acknowledge receipt of an addendum to the bid documents, 
but only if: 
(1) It is clear from the bid that the bidder received the 
addendum and intended to be bound by its terms; or 
(2) The addendum involved did not affect price, quantity, 
quality, or delivery. 
2. Mistakes Where Intended Correct Bid is Evident. If the mistake and 
the intended correct bid are clearly evident on the face of the bid 
form, or can be substantiated from accompanying documents, the 
Manager may accept the bid. Examples of mistakes that may be 
clearly evident on the face of the bid form are typographical errors, 
errors in extending unit prices, transposition errors, and arithmetical 
errors. For discrepancies between unit prices and extended prices, 
unit prices shall prevail. 
3. Mistakes Where Intended Correct Bid Is Not Evident. 
The City may not accept a bid in which a mistake is clearly evident 
on the face of the bid form but the intended correct bid is not clearly 
evident or cannot be substantiated from accompanying documents. 
2.20.080 Time For Acceptance. 
Bids shall be valid for 30 days unless otherwise specified in the bid documents. 
2.20.085 Extension of Time For Acceptance of Bid. 
Notwithstanding 2.20.080, after opening bids, the City may request that bidders 
extend the time during which the City may accept their bids. 
2.20.090 Bid Evaluation and Award. 
A. General. The contract, if awarded, is to be awarded to the lowest 
responsible bidder. Consistent with the provisions of the bid documents, 
awards may be made by item, groups of items, or entire bid in the public 
interest as determined by the City. The City reserves the right to reject 
any bid not in compliance with the bid documents or all bids pursuant to 
ORS 279.035 when it is in the public interest to do so. 
B. Special Requirements. The bid documents shall set forth any special 
requirements and criteria which will be used to determine the lowest 
responsible bidder. No bid shall be evaluated for any requirement or 
criterion that is not disclosed in the bid documents or City regulation. 
C. Product Acceptability. 
1. The bid documents shall set forth the evaluation criteria to be used 
in determining product acceptability. The City may require the 
submission of bid samples, descriptive literature, technical data, or 
other material, and may also provide for accomplishing any of the 
following prior to award: 
a. Demonstration, inspection or testing of a product prior to 
award for such characteristics as quality or workmanship; 
b. Examination of such elements as appearance, finish, taste, 
or feel; or 
c. Other examinations to determine whether the product 
conforms with specifications. 
2. The acceptability evaluation is conducted only to determine that a 
bidder's offering is acceptable as provided in the bid documents. 
Any bidder's product that does not meet the minimum requirements 
shall be rejected. Product rejections are not considered bidder disqualifications 
and are not grounds for appeal under ORS 279.043. 
D. Determination of Lowest Responsible Bidder. Following determination of 
product acceptability as set forth in subsection (3) if any is required, bids 
will be evaluated to determine which bidder offers the lowest cost to the 
City in accordance with the evaluation criteria set forth in the bid 
documents. Only objectively measurable criteria which are set forth in the 
bid documents shall be applied in determining the lowest responsible 
bidder. Examples of such criteria include, but are not limited to, 
transportation cost, volume weighing, trade-in allowances, depreciation 
allowances, cartage penalties, and ownership or life cycle cost formulas. 
Evaluation factors need not be precise predictors of actual future costs; 
but to the extent possible, such evaluation factors shall: 
1. Be reasonable estimates based upon information the City has 
available concerning future use. 
2. Treat all bids equitably. 
3. Recognize that public policy requires acquisitions and public 
improvements to be accomplished at the least cost. 
ORS 279.023(1). 
E. Restrictions. Nothing in this section shall be deemed to permit contract 
award to a bidder submitting a higher quality item than that designated in 
the bid documents if such bidder is not also the lowest responsible bidder 
as determined under subsection (4) of this section. Further, this section 
does not permit negotiations with any bidder. 
2.20.095 Low Tie Bids. 
A. Definition. Low tie bids are low responsive bids from responsible bidders 
that are identical in price, fitness, availability and quality and which meet 
all the requirements and criteria set forth in the bid documents. 
B. Award. 
1. Low tie bids are subject to the Oregon preference contained in 
ORS 279.021(1): 
a. "In all public contracts, the public contracting agency shall 
prefer goods or services that have been manufactured or 
produced in this state if price, fitness, availability and quality 
are otherwise equal." 
2. Low tie bids that remain tied after application of the statutory 
Oregon preference shall be awarded according to the following 
sequence: 
a. Preference shall be given to the bidder whose principal 
offices or headquarters are located in Oregon. 
b. If a tie still remains after applying (1) above, award shall be 
made by drawing lots among any tied Oregon bidders. Such 
bidders shall be given notice and an opportunity to be 
present when the lots are drawn. 
c. If none of the tied bidders is located in Oregon, award of the 
contract shall be made by drawing lots. 
2.20.100 Rejection of Individual Bids or Proposals. 
A. General. This section applies to rejections, in whole or in part, of 
individual bids or proposals. In accordance with ORS 279.035, the City 
may reject in whole or in part, any bid not in compliance with all prescribed 
bidding procedures and requirements. No bid shall be considered unless 
the bid security, properly executed, has been submitted with the bid as 
required by the bid documents. 
B. Reasons for Rejection. Reasons for rejecting a bid include but are not 
limited to: 
1. The bidder has not prequalified under ORS 279.039 or the rules in 
this chapter, or has been disqualified under ORS 279.037. 
2. The bidder has been declared ineligible by the Commissioner of the 
Bureau of Labor and Industries under ORS 279.361. 
3. The bid is not responsive, because it does not conform in all 
material respects to bid documents. 
4. The supply, service, or construction item offered in the bid is 
unacceptable by reason of its failure to meet the requirements of 
the bid documents or permissible alternates or other acceptability 
criteria set forth in the bid documents. 
2.20.105 Negotiation With Bidders Prohibited. 
Unless a request for proposal is used, the City shall not negotiate with any bidder 
prior to award of a contract. After award of the contract, modifications to the 
contract shall be made with change orders or addenda to the contract and in 
accordance with the exemption rules as set in Chapter 2.22 of this Code. 
2.20.110 Bidder Disqualification. 
A. Grounds for Disqualification. As provided in ORS 279.037, the following 
are grounds for bidder disqualification: 
1. The person does not have sufficient financial ability to perform the 
contract. If a bond is required to ensure performance of a contract, 
evidence that the person can acquire a surety bond in the amount 
and type required shall be sufficient to establish financial ability. 
2. The person does not have equipment available to perform the 
contract. 
3. The person does not have key personnel available of sufficient 
experience to perform the contract. 
4. The person has repeatedly breached contractual obligations to 
public and private contracting agencies. 
B. Investigation. The City may make such investigation as is necessary to 
determine whether a person is qualified. If a bidder or prospective bidder 
fails to supply information promptly as requested by the City, such failure 
is grounds for disqualification. 
C. Trade Secret. Any information voluntarily submitted by a bidder or 
prospective bidder pursuant to an investigation under sub-section (2) of 
this section or in a prequalification statement required by ORS 279.039 or 
in a prequalification request submitted pursuant to ORS 279.041 shall be 
deemed a trade secret pursuant to ORS 192.500(1)(b) and (e) if 
requested by the person submitting the information and verified to be a 
trade secret by the public agency. 
D. Notice of Disqualification. The bidder or prospective bidder will be notified 
in writing by personal service or certified mail of the City's decision to 
disqualify the person from bidding with the City. The notice shall contain: 
1. The effective date of the disqualification and the effective period of 
disqualification. 
2. The grounds for disqualification from bidding. 
3. A statement of the contractor's appeal rights and applicable appeal 
deadlines. 
E. Appeal of Disqualification. If a contractor wishes to appeal the City's 
decision to disqualify, the contractor must notify the City in writing within 3 
business days after receipt of the notification. 
2.20.115 Cancellation of Invitations to Bid. 
A. Cancellation In the Public Interest. An invitation to bid may be canceled in 
whole or in part, and all bids may be rejected when it is in the public 
interest as determined by the Manager. The reasons, therefore, shall be 
made part of the bid file. 
B. Notice of Cancellation. When an invitation to bid is canceled prior to bid 
opening, notice of cancellation shall be sent to all holders of bid 
documents. When an invitation to bid is canceled after bid opening, notice 
shall be sent to those bidders who submitted a bid. The notice of 
cancellation shall: 
1. Identify the invitation to bid; and 
2. Briefly explain the reason for cancellation; and 
3. Where appropriate, explain that an opportunity will be given to 
compete on any resolicitation. 
2.20.120 Disposition of Bids or Proposals if Bid Canceled. 
A. Prior to Bid Opening. When an invitation for bids is canceled prior to bid 
opening, all bids received will be returned to bidders unopened, if 
submitted with a clearly visible return address. If there is no return 
address on the envelope, the bid will be opened to determine the source 
and then returned to sender. 
B. After Bid Opening. When all bids are rejected, the bids received shall be 
retained and become part of the City's permanent file. 
2.20.125 Documentation of Award. 
A. Basis of Award. Following award, a record showing the basis for 
determining the successful bidder shall be made a part of the bid file. 
B. Contents of Award Record. The record shall consist of: 
1. Completed bid tabulation sheet. 
2. Written justification for any rejection of lower bids. 
2.20.130 Foreign Contractor. 
If the amount of the contract exceeds $10,000 and the contractor is a "foreign 
contractor," the contractor shall promptly report to the Oregon Department of 
Revenue on forms to be provided by the Department of Revenue the total 
contract price, terms of payment, length of contract and such other information as 
the Department of Revenue may require before final payment can be received on 
the contract. A copy of the report shall be forwarded to the City. 
The City shall satisfy itself that the above requirements have been complied with 
before it issues final payment on the contract. For the purposes of this rule, a 
foreign contractor is one who is not domiciled in or registered to do business in 
the State of Oregon. 
2.20.135 Availability of Award Decisions. 
A. Contract Documents. A signed purchase order, price agreement, or 
contract document, as applicable, shall be sent to the successful bidder. 
B. Notification to Unsuccessful Bidders. Unsuccessful bidders need not be 
notified. Tabulations of awarded bids may be obtained for a nominal 
charge in person or by submitting to the City a written request stating the 
bid number and a self-addressed, stamped envelope. 
C. Availability of Bid Files. Completed bid files shall be available for public 
review at the City. 
D. Copies From Bid Files. Copies of material from bid files, other than 
previously described tabulation sheets, may be obtained upon payment of 
a reasonable copying charge. 
2.20.140 Performance Security. 
A. Public Improvements Contract. Except in emergencies, when the 
requirement may be waived pursuant to ORS 279.029(3), a performance 
bond in a sum equal to the contract price shall be required for all public 
improvement contracts in excess of $50,000. 
B. Other Public Contracts. The City may require performance security for 
other public contracts. Such requirements shall be stated in the bid 
documents. 
C. Contracts Under $10,000. Performance bonds for a contract under 
$10,000 shall be utilized only in critical circumstances, so as not to 
discourage competition. 
D. Requirement for Surety Bond. A surety bond furnished by a surety 
company authorized to do business in Oregon is the only acceptable form 
of performance security unless otherwise specified in the bid documents. 
E. Time for Submission. Upon request by the City, the apparent successful 
bidder must furnish the required performance bond within 10 days. 
Prompt submittal of the performance bond is required to ensure timely 
project initiation. Failure to furnish the bond prior to the deadline may 
result in rejection of the bid, and forfeiture of bid security and award to the 
next lowest responsible bidder. 
2.20.145 Right to Audit Records. 
A. Audit of Cost or Pricing Data. The City may, at reasonable times and 
places, audit the books and records of any person who has submitted cost 
or pricing data according to the terms of a contract to the extent that such 
books and records relate to such cost or pricing data. Any person who 
receives a contract, for which cost or pricing data are required, shall 
maintain such books and records that relate to such cost or pricing data 
for 3 years from the date of final payment under the contract, unless a 
shorter period is otherwise authorized in writing. 
B. Contract Audit. The City shall be entitled to audit the books and records of 
a contractor or any subcontractor under any contract or subcontract to the 
extent that such books and records relate to the performance of such 
contract or subcontract. Such books and records shall be maintained by 
the contractor for a period of 3 years from the date of final payment under 
the prime contract and by the subcontractor for a period of 3 years from 
the date of final payment under the subcontract, unless a shorter period is 
otherwise authorized in writing. 
2.20.150 Right to Inspect Plant. 
A. Time for Inspection. The City may, at reasonable times, inspect the part 
of the plant or place of business of a contractor or any subcontractor 
which is related to the performance of any contract awarded. 
B. Access to Plant or Place of Business. As a condition of bidding, bidders 
agree that the City may enter a contractor's or subcontractor's plant or 
place of business during normal business hours for the following 
purposes: 
1. Inspect and/or test supplies or services for acceptance by the City 
pursuant to the terms of the bid. 
2. Investigate in connection with a bidder's application, a minority 
business certification, or bidder qualification. 
C. Contractual Provisions. Contracts may provide that the City may inspect 
supplies and services at the contractor's or subcontractor's facility and 
perform tests to determine whether they conform to the bid documents, or, 
after award, to contract requirements, and are therefore acceptable. Such 
inspections and tests shall be conducted in accordance with the terms of 
the contract. 
D. Procedures for Trial Use and Testing. The City may establish operational 
procedures governing the testing and trial use of equipment, materials, 
and the application of resulting information and data to specifications or 
procurements. 
E. Conduct of Inspections. 
1. Inspectors. Inspections or tests shall be performed so as not to 
unduly delay the work of the contractor or subcontractor. No 
change of any provision of the specifications or the contract may be 
required by the inspector without written authorization of the City 
unless otherwise specified in the bid documents. The presence or 
absence of an inspector shall not relieve the contractor or 
subcontractor from any requirement of the contract. 
2. Location. When an inspection is made in the plant or place of 
business of a contractor or subcontractor, such contractor or 
subcontractor shall provide without charge all reasonable facilities 
and assistance for the safety and convenience of the person 
performing the inspection or testing. 
3. Time of Testing or Inspection. Inspection or testing of supplies and 
services performed at the plant or place of business of any 
contractor or subcontractor shall be performed at reasonable times 
during normal business hours. 
F. Inspection of Construction Projects. On-site inspection of construction 
shall be performed in accordance with the terms of the contract. 
2.20.155 Grounds for Contract Cancellation. 
A contract may be canceled by the City for any violation of the provisions of the 
contract. Such provisions generally include, but are not limited to: 
A. Standard terms and conditions included in all contracts. 
B. Product or service specifications. 
C. Delivery or completion requirements. 
D. Contracted pricing and price escalation/de-escalation clauses. 
Chapter 2.21 
PUBLIC IMPROVEMENT CONTRACTS 
(Ord. 5176 §1, 2003) 
Sections: 
2.21.000 Application. 
2.21.005 Competitive Bidding. 
2.21.010 Public Notice. 
2.21.015 Bid Evaluation and Award. 
2.21.020 Contract Cancellation Procedures. 
2.21.025 Retainage. (ORS 279.420, 279.575) 
2.21.030 Progress Payments. (ORS 279.575) 
2.21.035 Final Inspection. (ORS 279.575(3)) 
2.21.040 Final Estimate and Final Payment. (ORS 279.575(3)) 
2.21.045 Claims for Unpaid Labor or Supplies. 
2.21.000 Application. 
In addition to the requirements set forth in Chapter 2.20 through Chapter 2.22, 
the following rules apply to public improvement contracts. 
2.21.005 Competitive Bidding. 
Public improvement contracts, if awarded, shall be awarded by the City to the 
lowest responsible bidder as defined by statute unless otherwise exempt under 
ORS 279.015, 279.053, 279.056 or the provisions of this code, including Chapter 
2.20 and 2.22. 
2.21.010 Public Notice. 
A. Trade Newspaper Advertisement. In addition to the requirements of 
2.20.015, public improvements having an estimated cost in excess of 
$50,000 shall be advertised for bids in at least one trade newspaper of 
general state-wide circulation. 
B. Prevailing Wage Rate Notice. If the following conditions apply, the City 
shall include in the public notice a statement that the bidder shall comply 
with the requirements of the prevailing wage law in ORS 279.350: 
1. The bid must be for public works as defined in ORS 279.348(3) 
which includes construction, reconstruction, major renovation of 
painting of roads, highways, buildings, structures and 
improvements of all types. 
2. The contract price for the project exceeds $25,000. 
3. The project is not regulated under the Davis-Bacon Act 
(40 USC 276a). 
2.21.015 Bid Evaluation and Award. 
Award of a public improvement contract shall be to the lowest responsible bidder 
on the basis of total bid price. If the bid includes unit prices and extensions for 
estimated quantities, the total bid price for the purpose of comparing bids will be 
the total sum computed from bid quantities and the unit prices entered thereon by 
the bidder with due adjustments being made for alternate items and any specified 
or authorized reductions, additions or changes. In case of conflict between a unit 
price and the corresponding extended amount, the unit price shall govern. 
2.21.020 Contract Cancellation Procedures. 
A. Termination Due to Circumstances Beyond the Control of the Contractor. 
1. Reasons for Termination. The City may, by written order or upon 
written request from the contractor, terminate the contract or a 
portion thereof if any of the following occur: 
a. The contractor is prevented from completing the work for 
reasons beyond the control of the City. 
b. Completion of the project is beyond control of the contractor. 
c. Or for any reason considered by the City to be in the public 
interest (other than a labor dispute or reason of any third 
party judicial proceeding relating to the work other than a suit 
or action filed in regards to a labor dispute). These reasons 
may include, but are not necessarily limited to, nonavailability 
of materials, phenomenon of nature of 
catastrophic proportions or intensity, executive orders of the 
President related to national defense, congressional or state 
acts related to funding. 
2. Payment When Contract is Terminated. When the contract, or any 
portion thereof, is terminated before completion of all items of work 
in the contract, payment will be made for the actual items of work 
completed under the contract, or by mutual agreement, for items or 
work partially completed. No claim for loss of anticipated profits will 
be allowed. 
3. Responsibility for Completed Work if Contract Terminated. 
Termination of the contract or a portion thereof shall not relieve the 
contractor of responsibility for the work completed, nor shall it 
relieve the surety of its obligation for any just claims arising from 
the work performed. 
B Termination of Contract for Default. 
1. If the contractor should persistently or repeatedly refuse to or fail to 
supply enough properly skilled workmen or proper materials for the 
efficient execution of the project, or should fail to make prompt 
payment to subcontractors for material or labor, or persistently 
disregard laws, ordinances or the instructions of the City or 
otherwise be guilty of a substantial violation of any provision of the 
contract, then the City, without prejudice to any other right or 
remedy and after giving the contractor or the surety 7 days' written 
notice, may terminate the employment of the contractor and take 
possession of the premises and of all materials, tools and 
appliances thereon as well as all other materials whether on the 
premises or not, on which the contractor has received partial 
payment. The City may finish the work by whatever method it may 
deem expedient. 
2. Required Response to Declaration of Default. If the above action is 
taken, the contractor or the surety shall provide the City with 
immediate and peaceful possession of all of the materials, tools 
and appliances located on the premises, as well as all other 
materials whether on the premises or not, on which the contractor 
has received any progress payment. Further, the contractor shall 
not be entitled to receive any further payment until the work is 
completed. On the completion of the work, determination shall be 
made by the City of the total amount the contractor would have 
been entitled to receive for the work, under the terms of the 
contract, had the contractor completed the work. If the difference 
between said total amount and the sum of all amounts previously 
paid to the contractor, which difference will hereinafter be called the 
"unpaid balance," exceeds the expense incurred by the City in 
completing the work, including expense for additional managerial 
and administrative services, such excess will be paid to the 
contractor, with the consent of the surety. If, instead, the expense 
incurred by the City exceeds the unpaid balance, the amount of the 
excess shall be paid to the City by the contractor or the surety. 
3. Expense of Completion. The expense incurred by the City shall be 
as determined and certified by the City. 
4. Refusal to Perform. In addition to and apart from the abovementioned 
right of the City to terminate the employment of the 
contractor, the contract may be canceled by the City for any willful 
failure or refusal on the part of the contractor to perform faithfully 
the contract according to all of its terms and conditions; however, in 
such event neither the contractor nor the surety shall be relieved 
from damages or losses suffered by the City on account of the 
contractor's breach of contract. 
5. Remedies are Cumulative. The City may, at its discretion, avail 
itself of any or all of the above rights or remedies and invoke any 
one of the above rights or remedies without prejudice or preclude 
the City from subsequently involving any other right or remedy set 
forth above or elsewhere in the contract. 
2.21.025 Retainage. 
A. Retainage of Five Percent. The amount to be retained from any given 
progress payment will be such that when added to the sum of amounts 
previously retained will equal not more than 5% of the value of completed 
work except if the contract work is 50% completed and the work is 
progressing satisfactorily, the retainage may be reduced or eliminated on 
the remaining progress payments. Any reduction or elimination of 
retainage shall be allowed only upon written application of the contractor, 
which application shall include written approval of the contractor's surety; 
except that when the contract work is 97 1/2% completed, the City may 
without application by the contractor, reduce the retained amount to 100% 
of the value of the contract work remaining to be done. If retainage has 
been reduced or eliminated, the City reserves the right in protecting its 
interests to reinstate at any time retainage from further progress 
payments. 
B. Alternatives to Cash Retainage. In lieu of cash retainage to be held by the 
City, the contractor may select one of the following options: 
1. Deposit of Securities. The contractor may deposit bonds or 
securities with the City or in any bank or trust company to be held 
for the benefit of the City. In such event, the City shall reduce the 
retainage in an amount equal to the value of the bonds and 
securities. This reduction in retainage will be made in the progress 
payments made subsequent to the time the contractor deposits the 
bonds and securities. 
The value of the bonds and securities will be determined 
periodically by the City and the amount retained on progress 
payments will be adjusted accordingly. The bonds and securities 
deposited by the contractor shall be fully assigned to the City or be 
payable to the City on demand and shall be of a character 
approved by the City Manager, including but not limited to the 
following: 
a. Bills, certificates, notes or bonds of the United States. 
b. Other obligations of the United States or its agencies. 
c. Obligations of any corporation wholly owned by the Federal 
Government. 
d. Indebtedness of the Federal National Mortgage Association. 
e. Time certificates of deposit or savings account passbooks 
issued by a commercial bank, savings and loan association, 
or mutual savings bank, duly authorized to do business in 
Oregon. 
f. Corporation bonds rated A or better by a recognized rating 
service. 
g. General obligation bonds of the State of Oregon or any 
political subdivision thereof. 
h. General obligation improvement warrants issued pursuant to 
ORS 287.502. 
i. Irrevocable letters of credit from a bank doing business in 
Oregon. 
At the time the City determines that all requirements for the 
protection of the City's interest have been fulfilled, all bonds and 
securities deposited as above provided will be released to the 
contractor. 
2. Deposit in Interest-Bearing Accounts. Upon written request of the 
contractor, the City shall deposit any amounts withheld as retainage 
in an interest-bearing account in a bank, savings bank, trust 
company or savings association for the benefit of the City. Interest 
earned on such account shall accrue to the contractor. 
C. Recovery of Costs. If the City incurs additional costs as a result of the 
exercise of any of the options for retainage described herein, the City may 
recover such costs from the contractor by reduction of the final payment. 
As work on the contract progresses, the City shall, upon request, inform 
the contractor of all accrued costs. 
2.21.030 Progress Payments. 
A. Request for Progress Payments. At a regular time each month, the 
contractor shall, if required by the contract documents, submit to the City a 
request for payment based upon an estimate of the amount of work 
completed and of the value of such completed work. This request shall 
also include an estimate of the amount and value of acceptable material to 
be incorporated in the completed work which has been delivered and 
acceptably stored. Upon verification and approval of the City, the sum of 
these values will be referred to the "value of completed work." With these 
estimates as a base, a progress payment will be made to the contractor, 
which progress payment shall be equal to the value of completed work, 
less such amounts as may have been previously paid, less such other 
amounts as may be deductible or as may be owing and due to the City for 
any cause, and less in amount to be retained in protection of the City's 
interest. 
B. Progress Payments Do Not Mean Acceptance of Work. Progress 
payments shall not be construed as an acceptance or approval of any part 
of the work covered thereby, and they shall in no manner relieve the 
contractor of responsibility for defective workmanship or material. 
C. Estimates for Progress Payments. The estimates upon which progress 
payments are based are not represented to be accurate estimates, and all 
quantities shown therein are subject to correction in the final estimate. If 
the contractor uses such estimates as a basis for making payments to 
subcontractors, this is at the contractor's own risk, and the contractor shall 
bear all loss that may result. 
2.21.035 Final Inspection. 
A. Notification of Completion. When the contractor determines that all 
construction work on the project has been completed, the contractor shall 
so notify the City in writing. The City shall make an inspection of the 
project and project records within 15 days of receiving said notice. If, at 
such inspection, all construction provided for and ordered under the 
contract is complete and satisfactory to the City, and all certifications, bills, 
forms and documents have been submitted properly, such inspection shall 
constitute the final inspection. 
B. Instructions to Complete the Work. If, however, at any inspection, any 
work in whole or in part is found unsatisfactory, or it is found that all 
certifications, bills, forms and documents have not been submitted 
properly, the City shall within 15 days provide instructions to the contractor 
on outstanding requirements to complete the project. At such time as the 
contractor determines full compliance with, and the execution of such 
instructions, the contractor shall notify the City in writing. The City shall 
make another inspection within 15 days after such notice and this 
inspection shall constitute the final inspection provided construction work 
has been completed satisfactorily. 
C. Acknowledgment of Acceptance. Upon satisfactory completion of all work 
required under the contract, the City shall acknowledge acceptance of the 
work in writing. 
2.21.040 Final Estimate and Final Payment. 
A. Submission of Final Estimate. As soon as practicable after final inspection 
of the work under the contract, if unit prices were applicable, the City shall 
prepare a final estimate of the quantities of the various classes of work 
performed. Following a determination of the total amount due the 
contractor, and following final acceptance of the work by the City, final 
payment shall be made to the contractor. 
B. Set-Off of Prior Payments. All prior partial estimates and payments shall 
be subject to correction in the final estimate and payment. 
C. Interest. Beginning 30 days after the date of final acceptance of the 
project by the City, the City shall pay to the contractor interest at the rate 
established by state statute on any money due and payable to the 
contractor. 
2.21.045 Claims for Unpaid Labor or Supplies. 
A. Right of Action. As provided in ORS 279.526 a person claiming to have 
supplied labor or materials for work on a public improvement contract let 
by the City for which the person has not been paid in full by the prime 
contractor or any subcontractor has a right of action on the contractor's 
bond, if a notice of such claim has been filed no later than 120 days after 
the day the person last provided labor or furnished materials except if the 
claim is for contribution to any employee benefit plan, in which case the 
notice shall be no later than 150 days. 
B. Notice of Claim. To initiate a claim against the contractor's bond, a person 
should file with the Finance Director of the City a Notice of Claim in the 
form and manner as set out in G. of this subsection. Any notice of claim 
should include the following information: 
1. Name and address of the claimant; 
2. Name of prime contractor; 
3. Title of project and contract date; 
4. Name of the public agency; and 
5. Name of bonding company (may be obtained from public agency). 
C. Response to Notice of Claim. Upon receipt of such Notice of Claim, the 
City shall: 
1. Send acknowledgment to claimant; 
2. Send copy of notice to contractor; 
3. File copy of Notice with Secretary of State; and 
4. File copy of Notice with bonding (surety) company. 
D. Referral to Surety Company. If the contract has been completed and all 
funds disbursed to the prime contractor, the City shall refer all claims to 
the surety company for resolution. The City shall not arrange for second 
payments directly to subcontractors or suppliers for work already paid for 
by the City. 
E. Discretionary Payment of Claim. If the contract is still in force, the City 
may, in accordance with ORS 279.314, pay a valid claim to the person 
furnishing the labor or services and charge the amount of the payment 
against funds due or to become due to the contractor under the contract. 
F. Liability for Claim. If the City chooses to make such a payment as 
provided in ORS 279.314, the contractor or the contractor's surety shall 
not be relieved from obligation with respect to any unpaid claims. 
G. Form of Claim. 
To: City of Grants Pass 
NOTICE IS HEREBY GIVEN that the undersigned, (insert name of 
subcontractor or supplier), a (corporation, partnership, sole proprietorship, 
etc.), generally consisting of (brief description) in the sum of $ 
against the bond taken from (name of prime contractor), as principal, and 
(name of bonding company), as surety, for the construction of the (title of 
project) at (name of agency), Grants Pass, Oregon, said contract dated 
(insert date) by and between the public agency, as Agent of the State, and 
(name of prime contractor), as Contractor.(insert a brief description of the 
work concerning which the bond was taken) 
DATED this day of , 19 . 
BY 
(claimant's name and title) 
Chapter 2.22 
PUBLIC CONTRACT EXEMPTIONS 
INTRODUCTION AND DEFINITIONS 
GENERAL EXEMPTIONS 
(Ord. 4585 §2, 1987; Ord. 5176 §1, 2003) 
Sections: 
2.22.015 Life Cycle Costing. 
2.22.020 Contracts Under Certain Dollar Amounts. (Ord. 4856 §1, 1996) 
2.22.025 Request for Proposal. 
2.22.030 Emergency Contracts. 
2.22.035 Equipment Repair and Overhaul. 
2.22.040 Contracts for Price Regulated Items. 
2.22.055 Gasoline, Diesel Fuel, Heating Oil, Lubricants and Asphalts. 
2.22.060 Copyrighted Materials. 
2.22.068 Periodicals. 
2.22.075 Purchases of Used Personal Property. 
2.22.080 Advertising Contracts. 
2.22.090 Investment Contracts. 
2.22.092 Personal Service Contracts. 
2.22.120 Single Seller of Product Required. 
2.22.139 Employee Benefit Insurance. 
2.22.140 Insurance Contracts. 
2.22.145 Affirmative Action Contracts. 
2.22.150 Contract Amendments (Including Change Orders and Extra Work). 
2.22.160 Requirements Contracts. 
2.22.170 Purchases Under Requirements Contracts. 
2.22.180 Specific Exemptions. 
2.22.190 Data and Word Processing Contracts. 
2.22.200 Telecommunications Systems Contracts. 
2.22.210 Specification of Particular Brand Names or Products. 
2.22.220 Copyrighted Materials. 
2.22.230 Single Manufacturer or Compatible Products. 
2.22.240 Product Prequalification. 
2.22.250 Brand Name or Mark Exemption Applications. 
2.22.260 Conditions of Exemptions. 
2.22.270 Auction Sales of Personal Property. 
2.22.280 Sales of Personal Property. 
2.22.290 Donations of Personal Property. 
2.22.300 Bid Security Requirements. 
2.22.310 Contracts Under $10,000. 
2.22.015 Life Cycle Costing. 
A. In determining the lowest responsible bidder, in the award of a contract, 
the City may use the concept of life cycle costing if it complies with 
Section B. of this rule. As used in this rule, life cycle costing means 
determining the cost of a product for its useful life. 
B. Prior to the time of writing specifications for the product, the Manager shall 
identify those factors which will have cost implications over the life of the 
product. 
C. The Invitation to Bid shall set out clearly the factors and methodology to 
be used in life cycle cost adjustments. 
D. At or after the formal bid opening, the results of life cycle costing 
adjustments shall be applied to the bid, and the bidder whose total bid 
results in the lowest ownership cost, taking into account the life cycle 
costing adjustments, shall be considered the lowest responsible bidder. 
2.22.020 Contracts Under Certain Dollar Amounts. 
A. The Manager may let public contracts not to exceed $25,000 for 
automobiles and trucks, and $50,000 for purchase of other goods, 
materials, supplies and services without formal competitive bidding, if the 
Manager has determined that the awarding of the contract without formal 
competitive bidding will result in cost savings and the following conditions 
are complied with: (Ord. 4856 §1, 1996) 
1. The contract is for a single project, and is not a component of or 
related to any other project. 
2. When the amount of the contract does not exceed $1,000, the 
Manager should, where feasible, obtain competitive quotes. 
3. When the amount of the contract is more than $1,000, the Manager 
shall obtain a minimum of three competitive quotes. The Manager 
shall keep a written record of the source and amount of the quotes 
received. If three quotes are not available, a lesser number will 
suffice provided that a written record is made of the effort to obtain 
the quotes. 
B. The Manager may, in his discretion, let public contracts for trade related 
projects, i.e., construction, maintenance, repair, or similar labor and 
materials contracts without formal competitive bidding if the Manager has 
determined that the awarding of the contract without formal competitive 
bidding will result in cost savings and the following conditions are complied 
with: 
1. The contract is for a single project, and is not a component of or 
related to any other project. 
2. When the amount of the contract does not exceed $1,000, the City 
should, where feasible, obtain competitive quotes. 
3. When the amount of the contract is more than $1,000, but less than 
$50,000, except as provided in subsection (4) the Manager shall 
obtain a minimum of three competitive quotes. The Manager shall 
keep a written record of the source and amount of the quotes 
received. If 3 quotes are not available, a lesser number will suffice 
provided that a written record is made of the effort to obtain the 
quotes. 
2.22.025 Request for Proposals. 
The City may, at its discretion, use request-for-proposal competitive procurement 
methods subject to the following conditions: 
A. Contractual requirements are stated clearly in the solicitation document. 
B. Evaluation criteria to be applied in awarding the contract and the role of an 
evaluation committee, if any, are stated clearly in the solicitation 
document. 
1. Criteria used to identify the proposal that best meets the public 
contracting needs may include but are not limited to cost, quality, 
service, compatibility, product reliability, operating efficiency and 
expansion potential. 
C. Solicitation document clearly states all complaint processes and remedies 
available. 
D. Solicitation document states the provisions made for vendors to comment 
on any specifications which they feel limit competition. 
2.22.030 Emergencies. 
A. The Grants Pass Council may, in its discretion, let public contracts without 
formal competitive bidding if an emergency exists and the emergency 
consists of circumstances that could not have been reasonably foreseen 
and requires prompt execution of a contract to remedy the condition. 
B. The Grants Pass Council shall adopt a resolution indicating the existence 
of the emergency stating with specificity the emergency conditions 
necessitating the prompt execution of the contract. 
C. Any contract awarded under this exemption shall be awarded within 60 
days following declaration of the emergency unless an extension is 
granted pursuant to ORS 279.015(4). 
2.22.035 Equipment Repair and Overhaul. 
A. Contracts for equipment repair or overhaul may be let without formal 
competitive bidding, subject to the following conditions: 
1. Service and/or parts required are unknown and the cost cannot be 
determined without extensive preliminary dismantling or testing; or 
2. Service and/or parts required are for sophisticated equipment for 
which specially trained personnel are required and such personnel 
are available from only one source. 
B. If the contract exceeds $25,000, the Manager shall document in its 
procurement file the reasons why competitive bids or quotes were deemed 
to be impractical. 
2.22.040 Contracts for Price Regulated Items. 
The City may, without competitive bidding, contract for the direct purchase of 
goods or services where the rate or price for the goods or services being 
purchased is established by federal, state, or local regulatory authority. 
2.22.055 Gasoline, Diesel Fuel, Heating Oil, Lubricants and Asphalts. 
The City is exempt from formal competitive bidding requirements for the 
purchase of gasoline, diesel fuel, heating oil, lubricants and asphalts if the City 
seeks competitive quotes from a majority of vendors in the area, makes its 
purchases from the least expensive source, and retains written justification for 
the purchase made. 
2.22.060 Copyrighted Materials. 
If the contract is for the purchase of copyrighted materials and there is only one 
known supplier available for such goods, the Manager may contract for the 
purchase of the goods without competitive bidding. 
2.22.068 Periodicals. 
The City may purchase subscriptions for periodicals, including journals, 
magazines, and similar publications without competitive bidding. 
2.22.075 Purchases of Used Personal Property. 
The Manager may purchase used personal property for $25,000 or less without 
competitive bidding if the Manager has determined that the direct purchase 
without competitive bidding will result in cost savings. For purchases of used 
personal property over $25,000, three competitive quotes shall be obtained. If 
three quotes are not available, a written record must be made of the attempt to 
obtain quotes. Purchases in excess of $50,000 shall be formally bid or procured 
through competitive proposal in accord with this code. 
2.22.080 Advertising Contracts. 
The Manager may purchase advertising without competitive bidding. 
2.22.090 Investment Contracts. 
The Finance Director may, without competitive bidding, contract for the purpose 
of the investment of public funds or the borrowing of funds by the City when such 
investment or borrowing of funds is contracted pursuant to duly enacted 
administrative regulations, Council resolutions, statute, ordinance, charter, or 
constitution. 
2.22.092 Personal Service Contracts. 
A. The following are personal service contracts: 
1. Contracts for services performed as an independent contractor in a 
professional capacity, including but not limited to the services of an 
accountant; attorney; architectural or land use planning consultant; 
physician or dentist; registered professional engineer; appraiser or 
surveyor; passenger aircraft pilot; aerial photographer; timber 
cruiser; data processing consultant or broadcaster. 
2. Contracts for services as an artist in the performing or fine arts, 
including but not limited to persons identified as photographer, 
filmmaker, painter, weaver or sculptor. 
3. Contracts for services of a specialized, creative and researchoriented, 
noncommercial nature. 
4. Contracts for services as a consultant. 
5. Contracts for educational and human custodial care services. 
B. The Following are not personal service contracts: 
1. Contracts, even though in a professional capacity, if predominantly 
for a product, e.g., a contract with a landscape architect to design a 
garden is for personal services, but a contract to design a garden 
and supply all the shrubs and trees is predominantly for a tangible 
product. 
2. A service contract to supply labor which is of a type that can 
generally be done by any competent worker, e.g., janitorial, security 
guard, crop spraying, laundry and landscape maintenance service 
contracts. 
3. Contracts for trade-related activities considered to be labor and 
material contracts. 
4. Contracts for services of a trade-related activity, even though a 
specific license is required to engage in the activity. Examples are 
repair and/or maintenance of all types of equipment or structures. 
2.22.120 Single Seller of Product Required. 
Subject to the requirements of rule 2.22.230, the City may purchase without 
competitive bidding if there is only one seller of a product of the quality required, 
or if the efficient utilization of existing equipment or supplies requires specification 
of a compatible product for which there is only one seller. 
2.22.139 Employee Benefit Insurance. 
The City may purchase employee benefit insurance without competitive bidding. 
2.22.140 Insurance Contracts. 
A. Agent of Record: The Manager may appoint a licensed insurance agent 
("agent of record") to perform insurance services in connection with more 
than one insurance contract. Among the services to be provided is the 
securing of competitive proposals from insurance carriers for all coverages 
for which the agency of record is given responsibility: 
1. Prior to the selection of an agent of record, the Manager shall make 
reasonable efforts to inform known insurance agents in the 
competitive market area that it is considering such selection. 
These efforts shall include a public advertisement in any newspaper 
of general circulation in the City. The advertisement shall generally 
describe the nature of the insurance that the City will require. 
2. In selecting an agent of record, the Manager shall select the 
agent(s) most likely to perform the most cost-effective services. 
B. Specific Proposals for Insurance Contracts. The Manager may solicit 
proposals from licensed insurance agents for the purpose of acquiring 
specific insurance contracts subject to the following conditions: 
1. The Manager shall make reasonable efforts to inform known 
insurance agents in the competitive market area of the subject 
matter of the contract, and to solicit proposals for providing the 
services required in connection with the contract. Such efforts shall 
include public advertisements in a newspaper of general circulation. 
2. The Manager shall select an agent on the basis of the most 
competitive offer considering coverage, premium cost, and service 
to be provided. 
2.22.145 Affirmative Action Contracts. 
Public contracts may be let without competitive bidding if the letting of the 
contract is pursuant to a specific affirmative action plan. Affirmative action is a 
program designed to insure equal opportunity in employment and business for 
persons otherwise disadvantaged by reason of race, color, religion, sex, national 
origin, age, or physical or mental handicap, including, but not limited to, personal 
practices of contractors, "set-aside" programs and minority business enterprises. 
2.22.150 Contract Amendments (Including Change Orders and Extra Work). 
Any contract amendment for additional work including change orders, extra work, 
field orders, or other change in the original specifications which increases the 
original contract price, may be made with the contractor without competitive 
bidding subject to the following conditions: 
A. The original contract was let by competitive bidding, unit prices or bid 
alternates were provided that established the cost for additional work, and 
a binding obligation exists on the parties covering the terms and conditions 
of the additional work; or 
B. The amount of the aggregate cost increase resulting from all amendments 
shall not exceed 10% of the initial contract, or 20% of the initial contract 
when the initial contract is for a face amount not exceeding $100,000. 
Amendments made pursuant to section A. of this rule are not included in 
computing the aggregate amount under this section. 
2.22.160 Requirements Contracts. 
A. The City may enter into requirements contracts whereby it is agreed to 
purchase requirements for an anticipated need at a predetermined price 
providing the following conditions are complied with: 
1. The contract must be let by competitive procurement process 
pursuant to the requirements of these rules. 
2. The term of the contract including renewals does not exceed three 
years. 
2.22.170 Purchases Under Requirements Contracts. 
A. When the price of goods and services has been established by a 
requirements contract pursuant to rule 2.22.160, the City may purchase 
the goods and services from the supplier without subsequent competitive 
bidding. 
B. The City may use the requirements contract entered into by another public 
contracting agency when a formal inter-agency agreement exists between 
the two agencies. 
2.22.180 Specific Exemptions. 
A. The Manager may request a ruling from the Public Contract Review Board 
exempting a particular contract or contracts from the bidding requirements 
of ORS 279.015 which are not otherwise exempted under these rules. 
The request shall contain the following: 
1. The nature of the project; 
2. Estimated cost of the project; 
3. A narrative description of the cost savings anticipated by the 
exemption from competitive bidding and the reasons competitive 
bidding would be inappropriate; 
4. Proposed alternative contracting and purchasing practices to be 
employed; and 
5. The estimated date by which it would be necessary to let the 
contract. 
B. The Contract Review Board may require such additional information as is 
deemed necessary to determine whether a specific contract is to be 
exempt from competitive bidding. 
2.22.190 Data and Word Processing Contracts. 
Contract for acquisition of data and word processing hardware and systems 
software may be let using alternate competitive procurement methods subject to 
the following conditions: 
A. If the contract amount does not exceed $50,000, the City shall, as a 
minimum, follow informal competitive procurement methods. Prior to 
selection of a vendor, reasonable efforts will be made to solicit proposals 
from three or more vendors. Justification of award shall be documented 
and become a public record of the City. 
B. If the contract amount exceeds $50,000, the City may use the request for 
proposal process (rule 2.22.025) and shall solicit written proposals. 
Solicitations shall be requested from appropriate vendors appearing on 
lists compiled by the Manager or by advertising in an appropriate trade 
publication of general circulation when required by statute. The City shall 
document the evaluation and award process, which will be part of the 
public record justifying the award. 
C. If the amount of the contract exceeds $500,000, in addition to the 
requirements of subsection B. of this rule, the City shall: 
1. Provide an opportunity for vendors to review requirements and, 
prior to submitting proposals, comment on any specifications which 
they feel limit competition; 
2. Provide that residual values be considered only if they are clearly 
ascertainable; and 
3. Provide that cost of conversion will be minimized by the City. 
Vendors competing in this category of procurement shall be given 
the opportunity to review the evaluation of their proposal before 
final management review and selection. If there is less than a 1% 
difference between the performance/cost ratio of the highest ranked 
proposals, appropriate consideration must be given to the 
procurement of equipment which will encourage competition. 
2.22.200 Telecommunications Systems Contracts. 
A. Contracts for acquisition of telecommunications system hardware and 
software may be let using alternate competitive procurement methods 
subject to the following conditions: 
1. If the contract amount does not exceed $50,000, the City shall as a 
minimum obtain competitive quotes. Prior to selection of a vendor 
reasonable efforts will be made to solicit proposals from three or 
more vendors. Justification of award shall be documented and 
become a public record of the City. 
2. If the contract amount exceeds $50,000, the City may use the 
request-for-proposal process (rule 2.22.025) and shall solicit written 
proposals. Solicitations shall be requested from appropriate 
vendors appearing on lists compiled by the Manager or by 
advertising in an appropriate trade publication of general circulation 
when required by statute. 
B. The telecommunications solicitation authorized in subsection A.2. shall: 
1. State the contractual requirements in the solicitations document. 
2. State the evaluation criteria to be applied in awarding the contract 
and the roles of any evaluation committee. Criteria that would be 
used to identify the proposal that best meets the City's needs may 
include, but are not limited to cost, quality, service, compatibility, 
product reliability, operating efficiency, and expansion potential. 
3. State the provisions made for vendors to comment on any 
specifications which they feel limit competition. 
2.22.210 Specification of Particular Brand Names or Products. 
A. Specifications for public contracts shall not expressly or implicitly require 
any product of any particular manufacturer or seller except pursuant to an 
exemption under this chapter. 
B. If there is no other practical method of specification, the City may 
designate a particular brand name, make, or product "or equal," but this 
practice should be avoided whenever practicable. 
2.22.220 Copyrighted Materials. 
The City may specify a specific copyrighted product. This exemption does not 
include patented or trade mark goods. 
2.22.230 Single Manufacturer or Compatible Products. 
A. If there is only one manufacturer or seller of a product of the quality 
required, or if the required product is data processing equipment which will 
be used for research where there are requirements for exchange of 
software and data with other research establishments, or if the efficient 
utilization of the existing equipment or supplies requires a compatible 
product of a particular manufacturer or seller, the City may specify such 
particular product subject to the following conditions: 
1. The product is selected on the basis of the most competitive offer 
considering quality and cost. The term "cost" includes not only the 
product price but also other items of expense such as costs related 
to quality or conversion. 
2. Prior to awarding the contract, the City has made reasonable effort 
to notify all known vendors of competing or comparable products of 
the intended specifications and invited such vendors to submit 
competing proposals. If the purchase does not exceed $50,000 
such notice and invitation may be informal. If the amount of the 
purchase exceeds $50,000, such notice shall include advertisement 
in the local newspaper of general circulation. 
B. If the amount of the purchase exceeds $50,000, and is not also pursuant 
to the data and word processing exemption, rule 2.22.290, the City shall 
document its actions in the bid file. Such documentation shall include: 
1. A brief description of the proposed contract or contracts. 
2. A detailed description of the reasons why the product and/or seller 
was selected and any competing products and/or sellers that were 
rejected. The description shall also include the efforts taken by the 
City to notify and invite proposals from competing vendors. 
C. If the City intends to make several purchases of the product of a particular 
manufacturer or seller for a period not to exceed two years, it may so state 
in the documentation required by subsection A.2. and section B., and such 
documentation shall be sufficient notice as to subsequent purchases. 
2.22.240 Product Prequalification. 
A. When it is impractical to create specific design or performance 
specifications for a type of product to be purchased, a City may specify a 
list of approved products by reference to particular manufacturers or 
sellers in accordance with the following product prequalification procedure: 
1. The Manager has made reasonable efforts to notify all known 
manufacturers or vendors of competitive products of its intention to 
accept applications for inclusion in its list of prequalified products. 
Notification shall include advertisement in a trade journal of statewide 
distribution when possible. In lieu of advertising, a Manager 
may notify vendors and manufacturers appearing on the 
appropriate list maintained by the City. 
2. The Manager permits application for prequalification of similar 
products up to 15 days prior to advertisement for bids on the 
product. 
B. If an application for inclusion in a list of prequalified products is denied, or 
an existing prequalification revoked, the Manager shall notify the applicant 
in writing. The applicant may appeal to the Contract Review Board. 
2.22.250 Brand Name or Mark Exemption Applications. 
The Manager may apply for and receive a brand name or make exemption ruling 
from the Board for current and contemplated future purchases. Applications shall 
contain the following information: 
A. A brief description of the contract or contracts to be covered. The 
description should include contemplated future purchases. 
B. The brand name, mark, or product to be specified. 
C. The reasons the agency is seeking the exemption. 
2.22.260 Conditions of Exemptions. 
The Board may grant exemptions if any of the following conditions are met: 
A. The exemption is not likely to encourage favoritism in public contracts or 
substantially diminish competition and will result in cost savings. 
B. There is only one manufacturer or seller of the product of the quality 
required, or efficient utilization of existing equipment or supplies requires 
acquisition of compatible equipment or supplies. 
C. The exemption is requested for the purchase of a particular product to be 
used in an experimental project. 
2.22.270 Auction Sales of Personal Property. 
Personal property may be sold at auction if the Manager determines that the 
auction contemplated will probably result in a higher net return than if the 
property were sold by competitive written bid. 
2.22.280 Sales of Personal Property. 
The City may sell personal property, without formal competitive bidding if the 
Manager has determined that a negotiated sale will result in increased net 
revenue and the following conditions are complied with: 
A. When the current market value per item is deemed to be less than $1,000, 
the Manager may establish a selling price, schedule and advertise a sale 
date, and sell to the first qualified buyer meeting the sale terms; or 
B. When the current value per item is deemed to exceed $1,000 the personal 
property must be offered for competitive written bid and be advertised in 
accordance with ORS 279.025, or be offered for sale at public auction in 
accordance with 2.22.270. If no bids are received or if a determination is 
made that the market value of the property exceeds the offer of the 
highest responsible bidder, all bids may be rejected and the Manager may 
negotiate a sale subject to the following conditions: 
1. An appraisal of the market value of the property is obtained and 
documented and the negotiated sale price exceeds the market 
value; or 
2. The sale amount exceeds the highest bid received through the 
bidding or auction process. 
2.22.290 Donations of Personal Property. 
A. The Manager may transfer personal property, including recyclable or 
reclaimed materials, without remuneration or only nominal remuneration 
without competitive bids to the following activities: 
1. Another public agency; or 
2. Any sheltered workshop, work activity center or group care home 
which operates under contract or agreement with, or grant from, 
any state agency and which is certified to receive federal surplus 
property; or 
3. Any recognized non-profit activity which is certified to receive 
federal surplus property. 
B. The City may donate or sell, without competitive bids, surplus personal 
property to recognized private non-profit social or health service activities, 
subject to the following conditions: 
1. A determination has been made that the property is not needed for 
other public purposes; 
2. If the property has a current market value of $250 or more, the 
donation or sale shall: 
a. be approved by the Manager; 
b. be documented by the Manager to be clearly in the public 
interest. 
3. The Manager determines this is the most efficient and cost-effective 
method for disposing of the property. 
C. The City shall maintain a record of all transfers, donations or sales 
authorized by subsections A. and B. of this section. 
2.22.300 Bid Security Requirements. 
A City may, in its discretion, waive the bid security requirements of ORS 279.027 
for contracts other than those for public improvements. 
2.22.310 Contracts Under $50,000. 
The City may, in its discretion, waive the bid security requirements of ORS 279.027 
and performance bond requirements of ORS 279.029 if the amount of the contract for 
the public improvement is less than $50,000. 
Chapter 2.32 
PERSONNEL 
Sections: 
2.32.010 Short Title. 
2.32.020 Purpose. 
2.32.030 Adoption and Amendment of Rules. 
2.32.040 Administrative Authority. 
2.32.010 Title. 
The title of this chapter shall be "The Personnel Ordinance of the City of Grants 
Pass." (Ord. 4349 §1, 1980) 
2.32.020 Purpose. 
This chapter is adopted to establish equitable and uniform procedures and 
standards for dealing with personnel matters; to attract to municipal service and 
to retain the best and most competent persons available; to assure that 
appointments and promotions of employees will be based on merit and fitness; 
and to provide a reasonable degree of job security for qualified employees. This 
chapter is not adopted to directly or indirectly influence the City Manager in his 
appointment, termination or discipline of employees; rather, this chapter is to 
provide the City Manager with the procedures and standards necessary to fulfill 
his City Charter responsibilities. (Ord. 4349 §2, 1980) 
2.32.030 Adoption and Amendment of Rules. 
Personnel rules shall be adopted and amended by resolution of the Council. The 
rules shall provide means to recruit, select, develop, and maintain an effective 
and responsive work force, and shall include policies and procedures for 
employee hiring and advancement, training and career development, job 
classification, salary administration, retirement, fringe benefits, discipline, 
discharge, and other related activities. All appointments and promotions shall be 
made in accordance with the personnel rules without regard to sex, race, color, 
age, religion or political affiliation; and, furthermore, shall be based on merit and 
fitness. The Council shall in no way interfere, directly or indirectly, with the City 
Manager's charter responsibilities to administer such personnel rules. (Ord. 4349 
§3, 1980) 
2.32.040 Administrative Authority. 
The City Manager shall be responsible for: 
A. Administering all the provisions of this chapter and of the personnel rules; 
and 
B. Preparing or causing to be prepared and recommending to the City 
Council personnel rules and revisions and amendments to such rules. 
(Ord. 4349 §4, 1980) 
 



I Love Grants Pass.com Grants Pass Climate Grants Pass 411.com JoCo-Scanning.info
Rogue Valley Group
Mayor and Council Council Meetings Election 2006 Municipal Code Council Minutes Development Code Search

Copyright © 2005 - Rogue Valley Group - All Rights Reserved
Contact: Timothy Burleson